The parent roll contract checklist in one page
- Specify the roll, not the product. Our published parent roll range is 2,560 mm to 5,600 mm wide, 2, 3 or 4 ply, 14.5 to 18 gsm, on 3, 6, 10 or 20 inch cores, in virgin wood pulp.
- MOQ is 35 metric tonnes, a tonnage and not a roll count. A jumbo roll is heavy enough that the two diverge fast, which is the most common misunderstanding in a first contract.
- Virgin pulp is a specification, not a marketing word. National standards exclude recycled fibrous material and prohibit deinking agent, so the claim must be verifiable on paper.
- Certification is the gating item for an EU-bound shipment. Our published set includes PEFC, FSC, ISO, FDA, SGS and EUDR, and the chain-of-custody certificate has to match the fibre you buy.
- Delivery is 30 days after the deposit. Our published terms are 30 days after deposit received, with payment by T/T, Western Union or PayPal.
A parent roll contract is decided on four variables — width, ply, grammage and core size — and every other term in the agreement hangs off those four. Get them wrong and the order does not just arrive late, it arrives as the wrong material, and a jumbo roll is heavy enough and expensive enough that a mistake is expensive in both directions.
I have put together the checklist we work through with converters and traders buying from Chinese mills, using the specification and terms we publish for our own toilet tissue parent roll. It is the same checklist I would use before signing any base paper supply agreement, and you can send it to a supplier and compare the answers side by side.
What is a parent roll, and why is it specified the way it is?
A parent roll is a large paper reel, usually bigger than a person, used for converting into toilet tissue, jumbo rolls, facial tissue, napkins, hand towels, kitchen towels and handkerchief paper. It is the stage between a paper mill and your converting line, and where the specification work happens, because everything downstream is inherited from it.
| Parameter | Published value | Why it is on the contract |
|---|---|---|
| Type | Toilet tissue parent roll | Fixes which converting line the material is aimed at. |
| Material | 100% virgin wood pulp | The pulp claim has to be documented, not asserted. |
| Core size | 3″, 6″, 10″, 20″ | Decides whether you need a chuck or a mandrel. |
| Roll width | 2,560 mm to 5,600 mm | The widest variable in the contract, and it sets your machine cost. |
| Ply | 2 / 3 / 4 ply | Determines sheet count and the converting line setup. |
| Grammage | 14.5, 15, 16, 17, 18 gsm | Basis weight per square metre, and the driver of your finished cost. |
| Colour | White | Whiteness affects appearance and claims. |
| Embossing | No | Embossing is a converting step, so it is yours, not the roll’s. |
| Packaging | Film shrink wrapped, full body | Full-body wrapping protects the roll in sea transit. |
| Sample | Provided free | Approval should precede the production order. |
| MOQ | 35 T | A tonnage minimum, which is why roll count and tonnes diverge. |
| Delivery time | 30 days after deposit received | Starts on payment, not on order confirmation. |
| Payment terms | T/T, Western Union, PayPal | Standard terms for a first contract with a new mill. |

Why is the minimum expressed in tonnes rather than rolls?
Because the MOQ on a parent roll contract is a tonnage minimum of 35 metric tonnes, and this is where first-time buyers most often get a number they did not expect. A 2,560 mm wide, 3 ply, 16 gsm jumbo roll weighs a substantial amount, and the arithmetic means 35 tonnes translates into a fairly small number of rolls at the wide end of the range and a much larger number at the narrow end.
Because tonnage and roll count move in opposite directions as width changes, a fixed tonnage minimum buys you more rolls of narrow stock and fewer of wide stock, so the same MOQ produces a different order in every width. That is why a quotation expressed only in tonnes is not one you can plan a converting schedule against. Ask for both numbers: the tonnage and the roll count at your width and ply.
There is a practical reason for the framing. Because paper is bought by weight from the mill, the mill’s own planning runs on tonnes, so a tonnage minimum reflects how the mill actually schedules.
How do you specify the raw material correctly?
Virgin pulp is a defined material requirement, not a marketing adjective, and the difference matters legally in every market that imports tissue paper. According to the national standard position described on our own parent roll category page, the raw materials of tissue paper should be wood, grass, bamboo and other raw fibre materials, and any recycled paper, paper prints, paper products and other recycled fibrous materials should not be used as raw materials, and deinking agent should not be used. Our page also makes the distinction buyers routinely get wrong: virgin wood pulp is made only from wood chips, cooking and extracting wood fibres without being used, whereas pure wood pulp refers to wood pulp that may include recycled pulp, that is waste pulp made from recycled waste paper.
Because the two terms look interchangeable on a product page but describe completely different material, and because recycled pulp carries health risks that virgin pulp does not, the specification has to name virgin wood pulp explicitly rather than accepting pure wood pulp on a datasheet. Our own published guidance on the word pure is blunt: when raw material information shows both terms on household paper packaging, choose virgin wood pulp.
Two further points on our published tissue parent roll features belong in a contract: the material is made with no chemical addition and no fluorescent agent, and the sheet is septic safe. Because a fluorescent agent claim is a consumer-facing claim in most retail markets, it has to be traceable to the specific roll rather than to a general statement about the mill.
Which certifications should the contract require?
Certification is where a first contract most often goes wrong, because the buyer treats a certificate as a brand name rather than as a chain-of-custody document linked to a specific fibre. Our published certification set includes PEFC, FSC, ISO, FDA, SGS and EUDR, and our own published guidance on what a supplier should hold is ISO 9001, FSC, PEFC and SGS.
According to the Forest Stewardship Council, Chain of Custody Certification is the mechanism the FSC provides for tracking certified material through a supply chain, and that is the document you need: a mill-level forest management certificate without it does not prove your roll came from certified fibre. According to the Programme for the Endorsement of Forest Certification, PEFC is a global alliance of national forest certification systems providing PEFC Chain of Custody certification for supply chain companies, so if your customer accepts PEFC rather than FSC, the certificate has to be issued under PEFC and cover your supplier.
For an EU-bound programme there is a third layer. According to the European Commission’s environment portal on deforestation, the EU Deforestation Regulation (EUDR) exists to guarantee that the products EU citizens consume do not contribute to deforestation or forest degradation, which means the due diligence data has to be traceable to the pulp you actually buy, not just to the mill. So the certificate clause should specify the scheme, the certificate number, the scope and the expiry, and state who supplies the traceability data for each shipment. Because certification is a documentary chain and not a quality claim, a certificate that does not cover the mill, the fibre, or the period of your order is worth nothing when the customer audits it.
What should the contract say about samples and quality inspection?
Sample approval should precede the production order, and the contract should say what the sample is and what it is evidence of. Our published policy is that samples are provided free for quality checking before the order is confirmed, and a production sample is provided before loading, and our FAQ describes the inbound material inspection and the standardised absorbency, tensile strength and tear resistance tests behind consistent quality.
There are three separate quality events and they are easy to conflate, so name them individually. The pre-production sample confirms the specification you ordered is what you intend to receive. The pre-shipment production sample confirms what is in the container is what that sample represented. The post-arrival inspection is where you verify the delivered goods. Because a claim raised after the container has been unloaded is materially harder to settle than one raised on the pre-shipment sample, the contract should specify which party inspects the loading, and require the production sample to be retained as the reference standard for later claims.
Make the specification itself the reference document. Because “virgin pulp” and “16 gsm” are only enforceable if they are written as tolerances and test methods rather than as labels, the contract annex should carry the ply, grammage, width and core size with tolerances, the pulp claim, the moisture and brightness limits, and the test method behind each number.
What is the working relationship you are actually contracting with?
Know whether you are contracting with a mill or with a trading company, because the two behave differently under pressure and the difference matters when something goes wrong. Our position is that we are a professional paper manufacturer with more than 20 years of experience, established in 2002 in the Jiangbei industrial zone of Ningbo, Zhejiang.
Our published capability description sets out the structure: more than 10 cutting machines, cooperation with professional processing factories for customer rewinding, a warehouse of about 30,000 square metres and a logistics fleet.
That distinction is worth naming explicitly. Because a converter who thinks they have contracted with a mill and who has actually contracted with a trader will get a different answer on a specification dispute, a delivery problem or a certificate query, and the recourse is against whoever is named on the invoice. If your requirement is a specific mill, ask for the mill’s name and whether the contract is with the mill or the trading entity.
Two more supplier-side points are worth checking. Our published advantage list notes that we are the exclusive agency of APP, Bohui and Sun, which matters if you want specific branded base paper, and it notes free samples before shipment, production samples before loading and after-sales responsibility for order problems.
What should the contract checklist actually contain?
Seven items, in the order that stops the most expensive mistakes, and each one should be a numbered clause or a numbered line on a specification annex rather than a paragraph of intent.
Specify the roll. Type, roll width with tolerance, ply, grammage with tolerance, core size, colour, embossing, material and the pulp claim in writing. Width and grammage carry the most money, and both are variables the mill can otherwise interpret in its own favour.
State the quantity in both units. The tonnage minimum of 35 T and the roll count at your width, and which of the two governs if they conflict.
Name the certifications. Scheme, certificate number, scope and expiry, plus the chain-of-custody obligation and who supplies the traceability data for each shipment.
Fix the quality reference. The approved pre-production sample, the test method behind every tolerance in the spec annex, and the retained production sample as the comparison standard for claims.
Fix the packing and the loading. Full body film shrink wrap, because a roll wrapped only at the core or the ends picks up moisture in a container and loses strength, plus the securing arrangement for loading. Because a jumbo roll is heavy, wide and high-diameter, the loading method and securing arrangement are part of the delivery, and a shipment that arrives with a damaged roll because it was not properly blocked and braced is an avoidable loss the contract can cover.
Fix the commercial terms and the claim process. Price basis and Incoterm, payment schedule, production lead time and when it starts, the sample policy, the inspection window on arrival, the reference document for comparison, and the escalation route.
Frequently asked questions about parent roll contracts
What is the MOQ for a parent roll order from China?
Our published MOQ for toilet tissue parent roll is 35 metric tonnes, and our company-level figure is a range of 35 to 50 metric tonnes depending on specification. Because this is a tonnage minimum rather than a roll count, the number of rolls varies with width and ply, so ask for both figures before planning the converting schedule.
What is the difference between virgin wood pulp and pure wood pulp?
Virgin wood pulp is made only from wood chips, cooking and extracting wood fibres without being used. Pure wood pulp refers to wood pulp but may include recycled pulp, that is waste pulp made from recycled waste paper. Our own published guidance is that when raw material information shows both terms on household paper packaging, choose virgin wood pulp, because recycled pulp carries health risks.
How long does a parent roll order take to deliver?
Our published delivery time is 30 days after the deposit is received, and our company-level guidance is 20 to 30 days fast delivery for mass production. The lead time is triggered by payment and final approval rather than order confirmation, so a contract that is agreed but unfunded does not start the clock.
Which certifications do I need for an EU customer?
Our published certification set includes PEFC, FSC, ISO, FDA, SGS and EUDR, and we can provide a PEFC certificate for EU and US customers. For an EU-bound programme, ask for the chain-of-custody certificate covering your specific mill and fibre, plus the traceability data EUDR requires, rather than accepting a general forest management certificate.
Post time: Nov-24-2026